Before:
Bathroom:
Completely demo existing bathroom.
• Moved HW tank to accommodate new, larger bathtub. • Supply & install HW tank pan - over flow drain to outside. Supplied & installed new tub, shower, shower walls and shower valve • Supply & install pocket door for bathroom • Supply & install grab bar for tub • Build shelving to accommodate dryer • Build storage behind bathtub • Supply & install new pedestal sink • Plumbing as required - included • Electrical as required |
After:
Bedroom:•Remove swing door and supply and install pocket door
•Move light switch to accommodate pocket door •Open wall to exterior storage area to make room for closet •Build closet including framing, electrical, drywall and paint • Drywall and paint wall space where new pocket is installed Handicap ramp, entrance way and roof cover:• Demo exterior wall for new doorway
• Frame and install door • Move all necessary electrical to accommodate new deck • Frame deck area and roof cover • Supply & install pressure treated 2x8 for landing • Supply & install PVC roof cover • Frame for ramp • Supply & install handrail system for deck and ramp |
Gordon J Campbell Construction Services
113-937 Dunford Avenue
Victoria, BC V9B 2S4 Call: 250-888-4885 Fax: 778-265-3712 |